(ANM) Brandon Fields Farm
(ANM) Brandon Fields Farm, OPDE UK Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 19.75 MW, grid supply point Bramford.
- Customer
- OPDE UK Limited
- Status
- Accepted to connect
- Capacity
- 19.75 MW
- Technology
- Solar, Storage (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Bramford
- Bulk supply point
- Thetford Grid 33kV
- Point of connection
- Brandon Primary 11kV
- Voltage
- 33 kV
- Date accepted
- 17 Nov 2023
- Target energisation
- 31 Oct 2034
- In a connection queue
- Yes
- Row last updated by the DNO
- 15 Jan 2024
- Licence area
- EPN
- Address
- Hockwood, Thetford
- Postcode
- IP26 4NF
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.