(ANM) Bishopstone

(ANM) Bishopstone, Anesco, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 19.96 MW, grid supply point Amersham.

Customer
Anesco
Status
Connected
Capacity
19.96 MW
Maximum import capacity
18.96 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Amersham
Bulk supply point
Ilmer Grid 33kV
Voltage
33 kV
Date connected
2 Jul 2024
In a connection queue
No
Row last updated by the DNO
14 Oct 2024
Licence area
EPN
Address
Aylesbury Vale
Postcode
HP17 8SL
Export MPAN
1050002943504

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.