(ANM) Bishopstone
(ANM) Bishopstone, Anesco, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 19.96 MW, grid supply point Amersham.
- Customer
- Anesco
- Status
- Connected
- Capacity
- 19.96 MW
- Maximum import capacity
- 18.96 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Amersham
- Bulk supply point
- Ilmer Grid 33kV
- Voltage
- 33 kV
- Date connected
- 2 Jul 2024
- In a connection queue
- No
- Row last updated by the DNO
- 14 Oct 2024
- Licence area
- EPN
- Address
- Aylesbury Vale
- Postcode
- HP17 8SL
- Export MPAN
- 1050002943504
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.