Albury Gas Station

Albury Gas Station, Gasrec Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.46 MW, grid supply point West Weybridge.

Customer
Gasrec Limited
Status
Connected
Capacity
1.46 MW
Technology
Bioenergy (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
West Weybridge
Bulk supply point
Guildford Grid 33kV
Point of connection
Shalford 11kV
Voltage
11 kV
Date connected
4 Jan 1997
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Sands Quarry, Guildford
Postcode
GU5 9BW
Export MPAN
1900090934655

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.