Adj Mill Drove

Adj Mill Drove, Savills, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Burwell.

Customer
Savills
Status
Connected
Capacity
10 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Burwell
Bulk supply point
Burwell Local Grid 33kV
Voltage
132 kV
Date connected
19 Dec 2016
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Adj Mill Drove, Cambs
Postcode
CB7 5AW
Export MPAN
1050001197846

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.