Abbey Mills Pumping Station

Abbey Mills Pumping Station, Thames Water Utilities Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4 MW, grid supply point West Ham.

Customer
Thames Water Utilities Limited
Status
Connected
Capacity
4 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
West Ham
Point of connection
West Ham Grid 11kV
Date connected
1 Jan 2006
In a connection queue
No
Row last updated by the DNO
14 Dec 2021
Licence area
London Power Networks plc
Address
Abbey Lane, Stratford
Postcode
E15 2RW
Export MPAN
1200060934011

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.