60 Victoria Embankment

60 Victoria Embankment, 60 Victoria Embankment, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3 MW, grid supply point City Road.

Customer
60 Victoria Embankment
Status
Connected
Capacity
3 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
City Road
Point of connection
Bankside C 11kV
Voltage
0.4 kV
Date connected
19 Jul 2014
In a connection queue
No
Row last updated by the DNO
16 May 2023
Licence area
London Power Networks plc
Address
Victoria Embankment
Postcode
EC4Y 0JP
Export MPAN
1200010112066

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.