Grid GuardianOpen the evidence in the app

(1U1637) Oakery No 1, The Oakery Landfill Site

(1U1637) Oakery No 1, The Oakery Landfill Site, Feltwell Energy Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.3 MW, grid supply point Bramford.

Customer
Feltwell Energy Limited
Status
Connected
Capacity
1.3 MW
Maximum import capacity
0.15 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Bramford
Bulk supply point
Thetford Grid 33kV
Point of connection
Feltwell Primary 11kV
Voltage
11 kV
Date connected
9 Sept 2003
In a connection queue
No
Row last updated by the DNO
14 Jul 2023
Licence area
EPN
Address
Lodge Road, Theftford
Postcode
IP26 4DR
Export MPAN
1023542073898
Import MPAN
1023542073666

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source