Hackney 66kV grid supply point
2 connections of 1 MW and over at Hackney 66kV in UK Power Networks's register of 14 Oct 2026: 0 MW accepted to connect and 8.8 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| Thames Water Coppermills | Thames Water Coppermills | Fossil - Oil | 7.2 | Connected | |
| Whipps Cross Hospital | James Lane EC | Gas | 1.6 | Connected |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.