Hackney 132kV grid supply point
1 connections of 1 MW and over at Hackney 132kV in UK Power Networks's register of 14 Oct 2026: 0 MW accepted to connect and 1.4 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| Great Ormond Street Hospital | Great Ormond Street Hospital | Gas | 1.4 | Connected |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.