Biggleswade grid supply point
1 connections of 1 MW and over at Biggleswade in UK Power Networks's register of 14 Oct 2026: 139.9 MW accepted to connect and 0 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| Land At Dunton Lane | Central Bedfordshire Council | Solar | 99.9 | Accepted to connect | 31 Oct 2034 |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.