Teeside Connection Node B
Teeside Connection Node B (NGET) has 1 project in NESO's TEC Register of 23 Oct 2026: 3,600 MW in the queue, 3,600 MW Gate 1, and 0 MW connected. Contracted capacity, not headroom.
- Transmission owner
- NGET
- Projects
- 1
- MW in the queue
- 3,600 MW
- Gate 1 MW
- 3,600 MW
- MW connected
- 0 MW
By technology
| Technology | Projects | MW |
|---|---|---|
| Gas | 1 | 3,600 |
Projects at Teeside Connection Node B
| Project | Technology | MW | Gate | Status | MW effective from |
|---|---|---|---|---|---|
| Bute Hydrogen Project 5 | Gas | 3,600 | Gate 1 | Scoping | 31 Oct 2035 |
Source
- NESO TEC Register, National Energy System Operator, publication of 23 Oct 2026. NESO Open Data Licence.