Ratcliffe GSP
Ratcliffe GSP (NGET) has 3 projects in NESO's TEC Register of 23 Oct 2026: 130 MW in the queue, and 41.76 MW connected. Contracted capacity, not headroom.
- Transmission owner
- NGET
- Projects
- 3
- MW in the queue
- 130 MW
- MW connected
- 41.76 MW
By technology
| Technology | Projects | MW |
|---|---|---|
| Solar | 1 | 130 |
| Storage | 1 | 130 |
| CHP (Combined Heat and Power) | 1 | 20.88 |
| Thermal | 1 | 20.88 |
Projects at Ratcliffe GSP
| Project | Technology | MW | Gate | Status | MW effective from |
|---|---|---|---|---|---|
| UK057-B Whatton Estate | Storage, Solar | 130 | Scoping | 30 Oct 2028 | |
| Redfield Road A | CHP (Combined Heat and Power) | 20.88 | Built | ||
| Redfield Road B | Thermal | 20.88 | Built |
Source
- NESO TEC Register, National Energy System Operator, publication of 23 Oct 2026. NESO Open Data Licence.