Orrin GSP
Orrin GSP (SHET) has 2 projects in NESO's TEC Register of 23 Oct 2026: 100.8 MW in the queue, 100.8 MW Gate 1, and 18 MW connected. Contracted capacity, not headroom.
- Transmission owner
- SHET
- Projects
- 2
- MW in the queue
- 100.8 MW
- Gate 1 MW
- 100.8 MW
- MW connected
- 18 MW
By technology
| Technology | Projects | MW |
|---|---|---|
| Onshore wind | 1 | 100.8 |
| Hydro | 1 | 18 |
Projects at Orrin GSP
| Project | Technology | MW | Gate | Status | MW effective from |
|---|---|---|---|---|---|
| Statkraft SEWF | Onshore wind | 100.8 | Gate 1 | Scoping | 31 Oct 2033 |
| Orrin (part of the Conon Cascade) | Hydro | 18 | Built |
Source
- NESO TEC Register, National Energy System Operator, publication of 23 Oct 2026. NESO Open Data Licence.