Meadowhead GSP
Meadowhead GSP (SPT) has 1 project in NESO's TEC Register of 23 Oct 2026: 0 MW in the queue, and 20 MW connected. Contracted capacity, not headroom.
- Transmission owner
- SPT
- Projects
- 1
- MW in the queue
- 0 MW
- MW connected
- 20 MW
By technology
| Technology | Projects | MW |
|---|---|---|
| Gas | 1 | 20 |
Projects at Meadowhead GSP
| Project | Technology | MW | Gate | Status | MW effective from |
|---|---|---|---|---|---|
| Caledonian Paper Mill (Meadowhead) | Gas | 20 | Built |
Source
- NESO TEC Register, National Energy System Operator, publication of 23 Oct 2026. NESO Open Data Licence.