London South Connection Node A 132kV Substation

London South Connection Node A 132kV Substation (NGET) has 2 projects in NESO's TEC Register of 23 Oct 2026: 480 MW in the queue, 480 MW Gate 1, and 0 MW connected. Contracted capacity, not headroom.

Transmission owner
NGET
Projects
2
MW in the queue
480 MW
Gate 1 MW
480 MW
MW connected
0 MW

By technology

TechnologyProjectsMW
Storage2480

Projects at London South Connection Node A 132kV Substation

ProjectTechnologyMWGateStatusMW effective from
Beddington 1 BESSStorage240Gate 1Scoping30 Oct 2037
Beddington 2 BESSStorage240Gate 1Scoping31 Oct 2037