Loch Kemp 275kV Switching Station

Loch Kemp 275kV Switching Station (SHET) has 1 project in NESO's TEC Register of 23 Oct 2026: 660 MW in the queue, and 0 MW connected. Contracted capacity, not headroom.

Transmission owner
SHET
Projects
1
MW in the queue
660 MW
MW connected
0 MW

By technology

TechnologyProjectsMW
Pumped storage1660

Projects at Loch Kemp 275kV Switching Station

ProjectTechnologyMWGateStatusMW effective from
Loch Kemp PSHPumped storage660Scoping31 Oct 2030