Kype Muir 132/33kV

Kype Muir 132/33kV (SPT) has 1 project in NESO's TEC Register of 23 Oct 2026: 0 MW in the queue, and 67.2 MW connected. Contracted capacity, not headroom.

Transmission owner
SPT
Projects
1
MW in the queue
0 MW
MW connected
67.2 MW

By technology

TechnologyProjectsMW
Onshore wind167.2

Projects at Kype Muir 132/33kV

ProjectTechnologyMWGateStatusMW effective from
Harting Rig Wind FarmOnshore wind67.2Built