Hatfield 33kV Substation
Hatfield 33kV Substation (NGET) has 2 projects in NESO's TEC Register of 23 Oct 2026: 0 MW in the queue, and 55.5 MW connected. Contracted capacity, not headroom.
- Transmission owner
- NGET
- Projects
- 2
- MW in the queue
- 0 MW
- MW connected
- 55.5 MW
By technology
| Technology | Projects | MW |
|---|---|---|
| Storage | 1 | 49.5 |
| Oil & AGT (Advanced Gas Turbine) | 1 | 6 |
Projects at Hatfield 33kV Substation
| Project | Technology | MW | Gate | Status | MW effective from |
|---|---|---|---|---|---|
| Tollgate 49.5MW BESS | Storage | 49.5 | Built | ||
| PeakGen BEGA - Hatfield | Oil & AGT (Advanced Gas Turbine) | 6 | Built |
Source
- NESO TEC Register, National Energy System Operator, publication of 23 Oct 2026. NESO Open Data Licence.