Grid GuardianOpen this site in the app

Grudie Bridge GSP

Grudie Bridge GSP (SHET) has 1 project in NESO's TEC Register of 23 Oct 2026: 49.9 MW in the queue, 49.9 MW Gate 1, and 0 MW connected. Contracted capacity, not headroom.

Transmission owner
SHET
Projects
1
MW in the queue
49.9 MW
Gate 1 MW
49.9 MW
MW connected
0 MW

By technology

TechnologyProjectsMW
Storage149.9

Projects at Grudie Bridge GSP

ProjectTechnologyMWGateStatusMW effective from
Achanalt Battery StorageStorage49.9Gate 1Scoping31 Oct 2027

Source