Fallago 400/33kV
Fallago 400/33kV (SPT) has 3 projects in NESO's TEC Register of 23 Oct 2026: 149.5 MW in the queue, 49.5 MW Gate 1, and 144 MW connected. Contracted capacity, not headroom.
- Transmission owner
- SPT
- Projects
- 3
- MW in the queue
- 149.5 MW
- Gate 1 MW
- 49.5 MW
- MW connected
- 144 MW
By technology
| Technology | Projects | MW |
|---|---|---|
| Onshore wind | 2 | 244 |
| Storage | 1 | 49.5 |
Projects at Fallago 400/33kV
| Project | Technology | MW | Gate | Status | MW effective from |
|---|---|---|---|---|---|
| Fallago Rig Wind Farm | Onshore wind | 144 | Built | ||
| Dunside Wind Farm (Formally Fallago Rig 2 Wind Farm) | Onshore wind | 100 | Awaiting Consents | 30 Apr 2029 | |
| Shielburn Energy Park | Storage | 49.5 | Gate 1 | Scoping | 30 Apr 2033 |
Source
- NESO TEC Register, National Energy System Operator, publication of 23 Oct 2026. NESO Open Data Licence.