Drummuir Windfarm at Keith 33kV Grid Supply Point (SHET) has 1 project in NESO's TEC Register of 23 Oct 2026: 0 MW in the queue, and 48.3 MW connected. Contracted capacity, not headroom.
Transmission owner
SHET
Projects
1
MW in the queue
0 MW
MW connected
48.3 MW
By technology
Technology
Projects
MW
Onshore wind
1
48.3
Projects at Drummuir Windfarm at Keith 33kV Grid Supply Point