CRAIG WATCH WIND FARM 132KV SUBSTATION (SHET) has 1 project in NESO's TEC Register of 23 Oct 2026: 72.6 MW in the queue, 72.6 MW Gate 1, and 0 MW connected. Contracted capacity, not headroom.
Transmission owner
SHET
Projects
1
MW in the queue
72.6 MW
Gate 1 MW
72.6 MW
MW connected
0 MW
By technology
Technology
Projects
MW
Onshore wind
1
72.6
Projects at CRAIG WATCH WIND FARM 132KV SUBSTATION