CARRADALE 3 132/33KV GRID SUPPLY POINT SUBSTATION (SHET) has 2 projects in NESO's TEC Register of 23 Oct 2026: 124.8 MW in the queue, 124.8 MW Gate 1, and 0 MW connected. Contracted capacity, not headroom.
Transmission owner
SHET
Projects
2
MW in the queue
124.8 MW
Gate 1 MW
124.8 MW
MW connected
0 MW
By technology
Technology
Projects
MW
Onshore wind
2
124.8
Projects at CARRADALE 3 132/33KV GRID SUPPLY POINT SUBSTATION