Beinn an Tuirc Substation

Beinn an Tuirc Substation (SHET) has 1 project in NESO's TEC Register of 23 Oct 2026: 95.2 MW in the queue, 95.2 MW Gate 1, and 0 MW connected. Contracted capacity, not headroom.

Transmission owner
SHET
Projects
1
MW in the queue
95.2 MW
Gate 1 MW
95.2 MW
MW connected
0 MW

By technology

TechnologyProjectsMW
Onshore wind195.2

Projects at Beinn an Tuirc Substation

ProjectTechnologyMWGateStatusMW effective from
Beinn an Tuirc 1Onshore wind95.2Gate 1Scoping31 Oct 2034